Short Description
Organizations shall submit a PSW in accordance with table 3.2 in the PPAP manual. and in compliance with Chrysler’s “Forever Requirements” process. …
Website: www.iaob.org | Filesize: 278kb
Content
Chrysler
Customer-Specific Requirements
For Use With PPAP 4th Edition
October 2007
1 . Chrysler 2007 - All rights reserved
1 Chrysler - Specific Instructions
Unless superseded by specific written direction from a Chrysler Procurement and Supply
representative, or by engineering drawing and specification requirements, the following
instructions apply.
1.1 Submission Levels
Organizations providing parts to a Chrysler Assembly plant shall follow the guidelines for
Submission Level 4.
Organizations providing certain designated parts to a Chrysler Component or Powertrain
plant shall follow the guidelines for Submission Level 2, or as otherwise specified by the
receiving plant.
In cases where Chrysler requires a bulk material submission, the organization shall
reference the bulk material section in the PPAP manual.
1.2 Submission to Customer
Organizations submitting their PSW’s for PRODUCTION PARTS designated for use at
any Chrysler production facility shall utilize the Powerway website available at
www.powerway.com. Organizations shall comply with all AQP methodology
requirements in Powerway.
?Organizations providing material for Chrysler S1 and subsequent PILOT BUILDS
shall also submit a PSW utilizing the above directions.
?Organizations shall submit a PSW in accordance with table 3.2 in the PPAP manual
and in compliance with Chrysler’s “Forever Requirements” process….
Get the file Download here